• lightnsfw@reddthat.com
    link
    fedilink
    arrow-up
    18
    ·
    1 day ago

    When I was a supervisor I used to tell people on my team that. I didn’t want them going above and beyond to make shit happen when we were short staffed because then the bean counters were gonna see that and determine we didn’t need more people. I told them they should shoot to get “exceeds” on their metrics but nothing beyond that because that was all that was needed to max out their performance review at the end of the year.