First truck lines are up and running!

These are very low throughput, so each of these trucks will actually idle form 4-8 hours, per cycle.

That started with my wife and I rebuilding the shipping lot underneath Ironworks, to make room for Truck Stations.

I also had to make the fueling station accessible. I decided to just move it over by the existing entryway, as a temporary setup. I’ll eventually build a full and proper fueling station on the other side of the road, when Liquid Biofuel is available to us.

And while I was recording and configuring the truck routes, my wife got a start on Cateriumworks.