    Not going nearly as fast as I hoped. But we will get there.

    34 cm from the floor dug out

    Concrete slab got placed

    10k L water pit and 2.5k L septic pit installed and hooked up

    Bathroom we completely drywalled and routed all of the electrical and water (not hooked up yet). Man doing drywall plasters to brick is the worst ever. You have 1, 15 minute chance to get it completely level and plumb and you can’t pull it back out if you push it in too deep otherwise it won’t stick. I never want to do it again. Luckily we are having the rest of the house plastered.

    Toilet, shower wall, bath, etc… Are all ready in the next room to install when the shower wall is waterproofed with a rubber layer and the drywall is completely sanded where there won’t be tiles.

    Half of the routing for the upstairs radiators is ready, but the contractor that promised to install the 2 temperature mixing system before winter break delayed by a month and a half…

    But it is going!