Summary

France’s Flamanville 3 nuclear reactor, its most powerful at 1,600 MW, was connected to the grid on December 21 after 17 years of construction plagued by delays and budget overruns.

The European Pressurized Reactor (EPR), designed to boost nuclear energy post-Chernobyl, is 12 years behind schedule and cost €13.2 billion, quadruple initial estimates.

President Macron hailed the launch as a key step for low-carbon energy and energy security.

Nuclear power, which supplies 60% of France’s electricity, is central to Macron’s plan for a “nuclear renaissance.”

  • theonlytruescotsman@sh.itjust.works
    link
    fedilink
    English
    arrow-up
    1
    ·
    16 hours ago

    The entirety of all nuclear fuel waste ever produced and that would be produced after 2000 years of fully nuclear energy produce and consumption at current rates wouldn’t fill a mid sized van.

    The nuclear waste excuse is oil industry propaganda, and you should feel bad for repeating it without getting a paycheck.

    • GenosseFlosse@feddit.org
      link
      fedilink
      English
      arrow-up
      1
      arrow-down
      1
      ·
      11 hours ago

      Wow, that’s good news! I guess we can just pay residents some rent to store the 4,925 40-foot containers full of nuclear harmless waste in their backyards then. Years of planning from scientists and engineers and millions of spending could have been avoided if the experts would have just read the comments on the internet!

      The estimated amount of nuclear waste in Germany after shutting down all nuclear power plants is 29,000 m3 for high-level waste and 300,000 m3 for low- and intermediate-level waste.

      http://large.stanford.edu/courses/2017/ph241/dory2/

      • theonlytruescotsman@sh.itjust.works
        link
        fedilink
        English
        arrow-up
        1
        ·
        10 hours ago

        That includes individual storage containers, which wouldn’t be needed if you oil loving freaks wouldn’t have required the most inefficient storage solutions in order to intentionally drive up costs. The actual waste is several orders of magnitude smaller.