• threelonmusketeers@sh.itjust.worksOPM
    link
    fedilink
    English
    arrow-up
    3
    ·
    1 month ago

    Not sure, the prime candidates would be B1061 or B1062, and they’re averaging turnaround times of ~60 days, so it might be tough to squeeze in 3 more flights. B1067 might be able to do 4 flights, as its average turnaround time is shorter.